Client
Charlotte Douglas International Airport
Location
Charlotte, NC
Markets
Aviation & Ports: Landside
Water: Sewer Collection and Interceptor
SERVICES
Planning/Pre-Design: Permits
Design: Civil Engineering, Environmental Engineering, Utility Design, Vehicular Traffic
Charlotte Douglas International Airport West Ramp Lavatory/Ground Support Equipment Area Sewers
To eliminate the need for waste carts to drive to a mid-field dumping area across taxiways at Charlotte Douglas International Airport, STV designed new 8-inch sewers for a new lavatory/ground support equipment area at the airport’s West Ramp. The sewers will accept waste from aircraft, which will then flow through a triturator and into Charlotte Water’s sewer system. In addition, STV designed water service lines to the lavatory facility and a new guard shack at the redesigned West Ramp gate. .
To accommodate additional aircraft parking, approximately 180 linear feet of existing sewer in Rental Car Road was replaced at a flatter slope. This required the design of a temporary traffic shift for the roadway that must remain open 24/7 for terminal access.
The project was part of Charlotte Douglas International Airport’s $2.5-$3.1 billion capital investment program.