Six-Mile Natural Gas Transmission Pipeline
STV was retained to plan, permit and design 4.5 miles of 20-inch and 1.5 miles of 12-inch high-pressure pipeline to provide natural gas to the client’s power generation station. The pipeline traverses highly variable terrain and involved crossings of streams, wetlands, highways, cultural sites and a rail yard. STV performed program management, pre-FEED and FEED engineering, surveying, construction support and environmental permitting services from inception through construction