Smith & Nephew Headquarters Renovations

Smith & Nephew, Inc.STV|DPM was contracted by Smith & Nephew, Inc, a leading portfolio medical technology company, to perform owner’s project management services for the renovation of its three-story office and laboratory building in Andover, MA. Approximately 85,000 square feet of the 100,000 square-foot office building was renovated as part of the program, which also included a restacking effort with new corporate office standards, new furnishings, and a new CEO suite. Construction took place over six phases within an occupied building. New amenities and features within the space are a high-end coffee kiosk; a video conference room; collaborative spaces; lobby and cafeteria upgrades; a new reception desk and board room, as well as conference and training centers; and a revitalized open office environment. The project also consists of renovations to the medical company’s demonstration lab, including new surgical lighting fixtures and cameras for broadcasting.

Read more about this project


Vertex Pharmaceuticals

Vertex PharmaceuticalsSTV|DPM was hired by Vertex to build a move sequencing plan for its six-month relocation from 700,000 sf of space in 11 different buildings in Cambridge to two connected buildings spanning 14 floors each in South Boston’s Innovation District.  The new Fan Pier campus totals 1,100,000 sf.  The intricate transition planning scope included purge initiative, relocation planning, implementation and decommissioning of offices and GMP, GLP, vivarium, and rad labs and implementation of an Access database tool specifically for Biotech equipment inventories.

Read more about this project


Connecticut College Science Center

CT College scienceSTV|DPM completed the renovation and expansion of New London Hall – Connecticut College’s historic first academic building.  Built in 1915, New London Hall houses the Life Sciences departments including Biology, Botany, Environmental Science, and Computer Science.

Augmenting Connecticut College’s facilities management department, STV|DPM worked with the general contractor and architect to provide complete project oversight, focusing on schedule and budget management. The project involved the renovation of the 25,500-square-foot New London Hall and attached 3,200-square-foot greenhouse, as well as the construction of a 13,600-square-foot addition to the building.  The building features 21 offices, five classrooms, seven teaching labs, and six research labs.

 


Connecticut Department of Public Health

CT dep of healthSTV|DPM managed FF&E coordination and move management services for the relocation of the Connecticut Department of Public Health's lab from its existing 86,000-square-foot facility in Hartford, to a brand new 110,000-square-foot facility in Rocky Hill. The scope of services included a complete inventory of all existing furniture and equipment; a review of all requirements for each lab and its contents; and the oversight of FF&E procurement and installation for each lab and office space including the verification of driver and data requirements. STV|DPM coordinated the moves of all staff, lab equipment, supplies and chemicals to the new location and provided decommissioning support for the staff in the disposition of equipment, furniture, supplies and chemicals.


Shire

ShireSTV|DPM provided comprehensive project oversight including the coordination of more than 60 vendors to facilitate the move from Shire’s former location in Cambridge.  The relocation into the new space, which consists over 65,000 square feet of laboratories, required an intense preliminary inventory.  In total, nearly 3,000 items were inventoried over a period of four months prior to the move, which occurred across 16 phases within a period of five months.  Over 3,200 mover-hours were used for the relocation of staff, office & lab equipment, cold chemicals and samples.

 


University of Hartford ISET Complex

HartfordThe University of Hartford's Integrated Science, Engineering & Technology (ISET) Complex project involved an addition of 37,000 square feet and a 108,000-square-foot renovation of administrative, academic and lab space. STV|DPM worked closely with the owner, architect and construction manager to ensure the building met the University's program, needs and expectations. Responsibilities included schedule & budget management, construction administration, coordination of staff and faculty moves and the coordination, installation and management of FF&E.