CSXT Bridge 193 over Mobile River

Built in 1927, CSXT Bridge 193 over the Mobile River, also known as the 14-Mile Bridge, provided only 135 feet of clearance on either side of its original swing span. To alleviate this navigational bottleneck, CSXT replaced the crossing with a vertical lift bridge providing substantially greater clearance for freight-carrying vessels. As part of the $72 million project, STV led design and plan preparation and provided value engineering services for the new 370-foot lift span.

What challenges did STV address?

The original swing span constrained maritime traffic on the Mobile River. Tow operators pulling multiple barges had to stop, break down their loads and move through the crossing with only a few barges at a time. The project also required a foundation design that accommodated an existing bridge foundation that had to remain in place.

What solutions did STV deliver?

STV provided value engineering for the drilled-shaft footings and concrete-filled steel pipe pile footings supporting the new lift span. The team also prepared design calculations and plans for two 119-by-38-foot pile footings, including one designed to accommodate the existing bridge foundation.

The new vertical lift bridge provides 300 feet of horizontal clearance and 60 feet of vertical clearance when raised, significantly expanding the navigable opening compared with the original swing span.

How does this project benefit the region?

The wider bridge opening improves maritime access into the Port of Mobile by reducing a longstanding constraint for vessels and barge traffic. The replacement maintains the rail crossing while providing substantially more room for freight movements along the Mobile River.

Key stats and accolades

  • 370-foot vertical lift span
  • 300 feet of horizontal clearance
  • 60 feet of vertical clearance when raised
  • Two 119-by-38-foot pile footings

Improving maritime access to the Port of Mobile through a wider, more efficient railroad bridge crossing.

Client

CSX Transportation

Location

Mobile, Alabama

Markets

Highways & Bridges: Fixed Bridges

Freight & Ports: Freight Rail Infrastructure

Services

Design & Engineering: Structural Engineering

Project Delivery: Value Engineering

Project Status

Planning > Design > Construction > Complete